Dated December 15, 2025, this joint Illinois agency report assesses electricity resource adequacy, reliability, and progress toward state clean energy and emissions goals under the Illinois Environmental Protection Act. It examines PJM and MISO capacity markets, projects supply-demand balances for 2026 - 2035, and models resource portfolios through 2045. Under baseline assumptions, regional capacity shortfalls are projected to begin in PJM in 2029 and MISO in 2031 unless additional capacity is developed. The study evaluates renewable energy, storage, thermal generation, and imports, and outlines mitigation planning and coordination with Illinois’ prospective Integrated Resource Planning process.

Free preview text

The first 5 pages, shown as text so search engines and readers can find this document.

Page 1

December 15, 2025 2025 Resource Adequacy Study Submitted to the Illinois General Assembly. Prepared in accordance with the Illinois Environmental Protection Act (415 ILCS 5/9.15(o)).

Page 2

(Intentionally left blank)

Page 3

2025 Resource Adequacy Study │December 2025 i Executive Summary Executive Summary The Climate and Equitable Jobs Act (CEJA) was passed by the Illinois General Assembly and signed into law by Governor Pritzker as Public Act 102-0662 on September 15, 2021. CEJA established a series of important changes to Illinois energy policy, including an overhaul to the Illinois Renewable Portfolio Standard (RPS), creation of a statewide policy target of 100% clean energy by 2050, targeted reduction of greenhouse gas (GHG) emissions from fossil generation facilities, incentives to promote electric vehicle adoption and reduce transportation sector fuel emissions, support for at-risk zero emission nuclear plants, financial support for communities faced with generation facility closures, financial support for clean energy workforce programs, and new equity requirements and labor standards applicable to the clean energy economy. CEJA also amended Section 9.15(o) of the EPAct to require the completion of a Resource Adequacy Study (RA Study) that assesses the State’s progress towards its renewable energy, green hydrogen technologies, and emissions reduction goals, along with the current and projected status of electric resource adequacy and reliability throughout Illinois with proposed solutions for any shortfalls that may be identified. In effect, this new provision implements a two-step process whereby (i) a RA Study is completed to determine if a resource adequacy shortfall is likely to occur given the current and projected state of the electric grid—communicated through the issuance of a report,1 and (ii) if such a shortfall is projected, a mitigation plan is completed to assess options to address the projected shortfall. This Resource Adequacy Study was developed through a coordinated effort among the Illinois Commerce Commission (ICC), the Illinois Power Agency (IPA), and the Illinois Environmental Protection Agency (IEPA), collectively “the Agencies.” The Agencies have prepared this report in response to the directive under Section 9.15(o) of the Illinois Environmental Protection Act (EPAct). The Agencies utilized the services of the IPA’s Procurement Planning Consultant, Energy and Environmental Economics, Inc. (E3), to conduct the analysis and support the overall process and development of the RA Study. The Agencies also conducted engagement with stakeholder groups, the RTOs, and Illinois utilities. The Agencies coordinated with PJM and MISO to verify modeling assumptions and seek guidance on available data resources and coordinated with the Illinois utilities to inform the treatment of load forecasts and cross- reference approaches with other utility-driven studies. This collaborative structure ensured 1 The RA Study report is to be issued publicly and delivered to the Illinois General Assembly and Governor’s Office.

Page 4

2025 Resource Adequacy Study │December 2025 ii Executive Summary that the study was grounded in the best available data and reflected current market developments. Resource Adequacy Context for Illinois Consumers Resource Adequacy (RA) evaluates whether there is sufficient electricity supply available to meet corresponding customer demand in all hours with a defined level of certainty. This is a critical concept for electricity system planning, which evaluates how future resource portfolios meet policy, affordability, and reliability objectives. No electric system is “perfectly reliable”—meaning that there is a zero percent chance of a loss of load event. Electric systems are instead designed to achieve a specific reliability standard which represents an acceptable probability of lost load over a range of possible conditions while balancing the feasibility and costs of meeting this target with available technologies. Illinois was one of many states to restructure its electric industry during the late 1990s and early 2000s to create competition in retail electricity service. In practice, restructuring shifted the day-to-day responsibility for organizing resource adequacy from vertically integrated utilities to the regional transmission organizations (RTOs) such as PJM and MISO, which provide two primary functions: i) system operations including generation dispatch and control of the high-voltage transmission system, and ii) market operations including the design, implementation, and settlement of wholesale market prices and transactions for energy, ancillary services, and capacity. PJM and MISO design and administer capacity markets as the primary mechanisms by which resource adequacy is assessed, measured, and compensated within each regional market. Customers in Illinois are served by several types of Load-Serving Entities (LSEs): municipal utilities, electric cooperatives, Alternative Retail Electricity Suppliers (ARES), and electric utilities, including electric utilities that that rely on the IPA to procure supply for default service for customers who do not select an ARES for service. Under the market structure of retail competition in Illinois, the costs of supplying customers with electricity are backstopped by the RTO wholesale markets through locational marginal prices (LMPs) for energy and by capacity market prices in each RTO zone in Illinois. In a competitive equilibrium, which is typically assumed for studies of this nature, retail customers in Illinois can expect to pay the wholesale market price for energy and capacity in their market zone. For eligible retail customers—defined as the residential and small commercial customers of Ameren, ComEd, and MidAmerican who have not switched to an ARES or enrolled in real- time pricing—the IPA determines, through its annual Electricity Procurement Plan, how to procure the capacity obligations needed to serve such customers. The IPA, and by extension the utilities, currently utilize different approaches to secure capacity for these residential

Page 5

2025 Resource Adequacy Study │December 2025 iii Executive Summary and small commercial customers, along with hourly pricing default service customers. Through the 2025 Electricity Procurement Plan, the IPA has only sought to secure a capacity hedge on behalf of Ameren customers. Subject to the terms of the IPA Electricity Procurement Plan, any capacity obligations not secured through an IPA electricity procurement event are acquired by the utilities through the MISO Planning Resource Auction (PRA). ComEd currently secures all capacity obligations for default service customers through the PJM Base Residual Auction (BRA). For default service customers on hourly pricing service, Ameren or ComEd procure capacity through the MISO PRA or PJM BRA, respectively, and pass those costs on directly to customers. ARES are responsible for meeting the energy and capacity needs of their customers. For MidAmerican, the level of exposure to capacity markets faced by eligible retail customers is negligible. Municipal electric utilities and rural electric cooperatives are load serving entities and thus responsible for the capacity obligations of their customers. Unlike Ameren and ComEd, municipal utilities and cooperatives either own generation or enter into contracts with generators for resource adequacy. The different mechanisms and different types of LSEs in Illinois contribute to challenges in managing future resource adequacy in the state. Each entity is focused on serving the immediate needs of its own customers, not in concert with each other, resulting in a patchwork of approaches by LSEs that make it difficult to plan for long-term resource adequacy needs. For example, an ARES cannot guarantee what its market share will be over time—the ARES may gain or lose customers. As a result, there is an inherent risk for an ARES to enter long-term capacity contracts. Similarly, the IPA has hedged capacity for Ameren Illinois eligible retail customers to manage price volatility in the MISO capacity auction rather than carry any long-term capacity commitments. Like an ARES, the IPA must consider the risk of customers switching prior to determining the amount of capacity to hedge. It can be challenging under the Illinois market construct to make any long-term commitments that could have an impact on changing the resource adequacy paradigm. Capacity prices are difficult to forecast with MISO utilizing a prompt auction format and PJM’s forward auction format only providing a three-year outlook. PJM and MISO have engaged in a series of reforms to their capacity market constructs, creating a cycle of continuous changes to their market rules which adds additional risk and uncertainty. The recent passage of the Clean and Reliable Grid Affordability Act (CRGA) holds numerous opportunities to potentially adjust the current paradigm, including provisions surrounding the completion of an Integrated Resource Plan (IRP) and providing the IPA with a potential pathway to complete long-term clean capacity procurements on behalf of all customers

Tags

Doxxly editorial guide

2025 Resource Adequacy Study: summary, contents and background

This guide helps you understand the scope of 2025 Resource Adequacy Study before or alongside reading the original document. It is based on the catalogue record, credited creator, source, classification and topics shown on this page. It does not replace the original work and does not invent claims about passages that Doxxly cannot verify.

Summary and overview

2025 Resource Adequacy Study is a 222-page documentcredited to Orson X. Penrose. Dated December 15, 2025, this joint Illinois agency report assesses electricity resource adequacy, reliability, and progress toward state clean energy and emissions goals under the Illinois Environmental Protection Act. It examines PJM and MISO capacity markets, projects supply-demand balances for 2026 - 2035, and models resource portfolios through 2045. Under baseline assumptions, regional capacity shortfalls are projected to begin in PJM in 2029 and MISO in 2031 unless additional capacity is developed. The study evaluates renewable energy, storage, thermal generation, and imports, and outlines mitigation planning and coordination with Illinois’ prospective Integrated Resource Planning process. It appears in the Environment & Sustainability collection, which groups it with other material that readers may use for comparison and further study.

The item can be approached in several ways. A reader looking for a quick orientation can begin with the free five-page preview, inspect the page structure and use the metadata to judge relevance. Someone undertaking deeper research can work through the complete file, search its indexed text, record useful page references and compare its treatment of Illinois, Resource adequacy, Electric grid reliability, PJM, MISO, Capacity markets, Clean energy policy, CEJA, Energy storage, Integrated resource planning with the related resources linked below.

Rather than reducing the work to a single claim, this page treats it as a source that should be read in context. The title, creator, publication source, licence and format all help explain what kind of evidence it may offer. Readers should distinguish the original author's statements from Doxxly's catalogue description, and should cite the original edition when using the material in academic, professional or published work.

Key topics and reader takeaways

The catalogue connects this document with Illinois, Resource adequacy, Electric grid reliability, PJM, MISO, Capacity markets, Clean energy policy, CEJA, Energy storage, Integrated resource planning. These terms offer practical entry points rather than a substitute for close reading. Start by identifying the definitions, examples, arguments, tables or visual explanations attached to each topic. Then note where the creator draws connections, makes distinctions or moves from background material to a conclusion, recommendation, calculation or narrative development.

A useful reading method is to separate description from interpretation. First record what the item actually presents: names, headings, figures, formulas, quotations or stated propositions. Next consider why those details matter within the whole work. Finally compare them with another source from the same subject area. This process helps turn a long digital file into evidence that can be evaluated rather than merely skimmed.

Table of contents and reading guide

The following is an editorial content guide based on the verified catalogue topics. It is not represented as the original author's formal table of contents. Use it to organise notes while moving through the 222 pages in the player.

  1. Part 1

    Illinois

    Use this section of the reading guide to identify how Illinois appears in 2025 Resource Adequacy Study, note important terms, and connect the subject to the wider purpose of the work.

  2. Part 2

    Resource adequacy

    Use this section of the reading guide to identify how Resource adequacy appears in 2025 Resource Adequacy Study, note important terms, and connect the subject to the wider purpose of the work.

  3. Part 3

    Electric grid reliability

    Use this section of the reading guide to identify how Electric grid reliability appears in 2025 Resource Adequacy Study, note important terms, and connect the subject to the wider purpose of the work.

  4. Part 4

    PJM

    Use this section of the reading guide to identify how PJM appears in 2025 Resource Adequacy Study, note important terms, and connect the subject to the wider purpose of the work.

  5. Part 5

    MISO

    Use this section of the reading guide to identify how MISO appears in 2025 Resource Adequacy Study, note important terms, and connect the subject to the wider purpose of the work.

  6. Part 6

    Capacity markets

    Use this section of the reading guide to identify how Capacity markets appears in 2025 Resource Adequacy Study, note important terms, and connect the subject to the wider purpose of the work.

  7. Part 7

    Clean energy policy

    Use this section of the reading guide to identify how Clean energy policy appears in 2025 Resource Adequacy Study, note important terms, and connect the subject to the wider purpose of the work.

  8. Part 8

    CEJA

    Use this section of the reading guide to identify how CEJA appears in 2025 Resource Adequacy Study, note important terms, and connect the subject to the wider purpose of the work.

When a heading in the original differs from this guide, follow the original heading in your citation. Page numbers can also vary between editions. Doxxly's direct page field is useful for navigation, but formal references should include the title, creator, source and edition details available in the file itself.

About Orson X. Penrose

Doxxly credits Orson X. Penrose as the author or creator of 2025 Resource Adequacy Study. This page does not add an unverified biography, job title or institutional affiliation. The attribution is preserved so readers can distinguish the creator from the hosting library and follow the original record when an external author link is available.

Author context matters because a work reflects a particular purpose, audience and point of view. Before relying on the material, consider what the creator set out to explain, when the source was produced and whether later research or revised guidance should also be consulted. For literature and philosophy, compare translations and editions; for technical material, check whether a newer version has superseded the one shown here.

About the source organisation

The recorded source for this item is ipa.illinois.gov. Doxxly provides access and discovery tools but does not claim to be the original publisher unless explicitly stated. Source links, creator attribution and the recorded Publicly available file collected for editorial review licence are displayed to help readers assess provenance and permitted use.

Provenance is especially important for reports, standards, presentations and working spreadsheets. Check the original source for amendments, supporting files and current policy. A trustworthy research workflow keeps the source URL with any notes or downloaded copy, verifies important figures against the original, and avoids treating an archived document as automatically current.

Visit ipa.illinois.gov

How to read and use this document

Begin with the title and opening pages, then use the guide above to decide whether to read sequentially or move to a particular topic. The Doxxly player provides previous and next navigation, a direct page field, zoom steps, fit-to-width and fit-to-page modes, rotation and fullscreen. These controls are useful when a page contains small type, a wide table, an image, a scanned layout or a dense sequence of notes.

The first five pages are open to every visitor. A plan unlocks the complete item and full-document search. Search is best used for distinctive names, technical terms or short phrases; broad words can produce too many possible contexts. When you find a useful passage, read the surrounding pages so that a sentence, chart or formula is not separated from its explanation.

If downloading is enabled, members can obtain the original PDF file. Keep the original format when formulas, slide sequencing, pagination or layout carries meaning. Respect the Publicly available file collected for editorial review terms displayed on this page, and use the rights-report link if you believe the attribution or availability needs review.

Research questions to consider

As you read 2025 Resource Adequacy Study, ask which audience the creator addresses, what problem or idea organises the work, what evidence is presented, and which assumptions remain unstated. Note whether important terms are defined consistently and whether examples represent a broader pattern or a narrow case. For quantitative material, record units, time periods, formulas and data sources. For interpretive material, separate the creator's language from your own summary.

A second set of questions concerns relevance today. Which parts remain durable, which depend on their historical or institutional setting, and what would need confirmation from a newer source? Following the tags and the Environment & Sustainability collection can reveal useful comparisons. Agreement between sources can strengthen confidence, while disagreement can point to changing definitions, methods, evidence or priorities.

Finally, decide what you need from the item: background knowledge, a quotation, a worked example, a model, a visual explanation or a starting bibliography. That purpose should guide the depth of reading and the notes you keep. Doxxly helps locate and navigate the source; careful interpretation remains the reader's responsibility.

Explore more Environment & Sustainability resources

Frequently asked questions about 2025 Resource Adequacy Study

Practical answers about reading, downloading and understanding this document on Doxxly.

More in Environment & Sustainability