This policy requires the District to include 100 hours per year of emergency operation, in addition to permitted testing and reliability-related operation, when calculating emergency backup generators' potential to emit (PTE) for permitting applicability. It addresses New Source Review, small-facility offset eligibility, and Title V or Synthetic Minor Operating Permit requirements. Emergency-operation emissions are excluded when calculating the amount of emissions that must be offset. The policy does not apply to emergency fire pump engines or emergency-use emissions exempt under Toxics New Source Review. Operators cannot reduce PTE by accepting an emergency-operation limit below 100 hours per year. The policy takes effect upon the director's signature, is not retroactive, and applies to existing permitted generators at their next permit application.
Free preview text
The first 5 pages, shown as text so search engines and readers can find this document.
Page 1
Policy: Calculating Potential to Emit for Emergency
Backup Power Generators
Policy When determining the Potential to Emit (PTE) for an emergency
backup power generator, the District shall include emissions
resulting from emergency operation of 100 hours per year, in
addition to the permitted limit for reliability-related and testing
operation.
Applicability This assumption of 100 hours per year of emergency operation will be
used to determine the applicability of District permitting
regulations, such as New Source Review and Title V Major Facility
Review. It will not be used to determine the amount of emissions
offsets required for a project that triggers New Source Review.
Emissions offsets represent ongoing emission reductions that continue
every year, year after year, in perpetuity. As such, offsets are
intended to counterbalance emissions that will occur every year, year
after year, on a regular and predictable basis, to ensure Reasonable
Further Progress towards attainment of the applicable ambient air
quality standards. Accordingly, the PTE that a facility needs to offset
is only its potential for such regular and predictable emissions - not
any emissions that will only occur infrequently when emergency
conditions arise.
In addition, this policy does not apply to emergency fire pump
engines. The assumptions about potential emergency usage are
different for emergency engines used to fight fires as compared to
emergency engines use to provide backup power. The length of time
that a facility may have to operate without grid power during any given
year could be significantly longer than the amount of time it would take
to put out a fire.
Finally, this policy does not apply for purposes of the Toxics New
Source Review requirements of District Reg. 2-5. Pursuant to Reg.
2-5-111, Reg. 2-5 does not apply to emissions from emergency use of
emergency standby engines.
Effective date This policy is effective when signed by the director and will not be
applied retroactively to previous permitting actions. For existing
permitted emergency generators, the policy will be implemented for
the next permit application.
Page 1 of 5
Page 2
Policy:
Who is
affected
Calculating Potential to Emit for Emergency
Backup Power Generators
This policy applies for calculating the PTE of emergency backup power
generators for purposes of determining the applicability of District
permitting regulations. Facilities with one or more such generators are
subject to the policy. Such facilities should presume that each of their
generators will experience 100 hours per year of emergency operation
when calculating their PTE for purposes of determining the
applicability of the permitting regulations in Reg. 2 - including the
District's New Source Review regulations (Reg. 2, Rule 2) and Title V
Major Facility Review regulations (Reg. 2, Rule 6).
The permitting regulations covered by this policy include the "small
facility" offsets provisions in Reg. 2-2-302.1. Reg. 2-2-302.1 provides
that for facilities with a PTE of less than 35 TPY, (i) offsets are
required only at a 1 :1 ratio (as opposed to a 1.15:1 ratio for larger
facilities); and (ii) the APCO will provide the offsets from the District's
Small Facility Banking Account (SFBA), subject to certain restrictions.
Some facilities with emergency backup power generators may have
been permitted in the past without taking any emergency operation
into account, which may have kept their PTE below 35 TPY and
rendered them eligible to take advantage of the SFBA. With 100
hours of emergency operation included, some of these facilities may
have a PTE above 35 TPY, rendering them ineligible for SFBA credit.
In such cases, the next time the facility applies for a permit, it will not
be eligible for the "small facility" offsets provisions in Reg. 2-2-302.1,
but will instead by subject to Reg. 2-2-302.2. Per Reg. 2-2-302.2, if
such a facility has previously received credits from the SFBA, the
owner/operator will be required to reimburse the SFBA for all credits
received from the SFBA for each pollutant where the PTE exceeds 35
TPY, and it will have to provide any additional offsets for that pollutant
at a 1.15:1 ratio.
This policy also applies for calculating a facility's PTE for purposes of
determining whether it is required to obtain a Title V permit or a
Synthetic Minor Operating Permit (SMOP) under Reg. 2-6. Some
facilities have been permitted in the past assuming 500 hours per year
of emergency operation. For these facilities, their PTE will be lower
using the presumption of 100 hours per year under this policy. If their
PTE is reduced below the Title V applicability thresholds, they may no
longer need a Title V permit or SMOP.
Note that certain District regulations include specific provisions that
exempt emergency operation, including Reg. 2, Rule 5. This policy
does not apply in situations covered by a specific regulatory
exemption. This policy also does not apply for determining the amount
of a facility's cumulative increase that must be offset.
Page 2 of 5
Page 3
Policy:
Rationale
Calculating Potential to Emit for Emergency
Backup Power Generators
100 hours represents a reasonable worst-case assumption regarding
the amount of time during any given year that a facility could have to
operate without outside power, which would necessitate emergency
operation of the facility's backup generator(s).
Emergency backup power generators are used to provide power in
emergency situations where a facility loses its external power supply
from the power grid. By its very nature, such emergency operation is
unplanned and infrequent, and when it does occur it is impossible to
predict how long it will last. Although it foreseeable that an emergency
backup power generator may have to operate to respond to
emergency conditions at some point during its useful life, it is not
possible to predict with any specificity exactly how frequently such
operations will occur, or for what duration. 100 hours is a reasonable
worst-case assumption of the longest a facility may need to operate on
backup power in any given year in the event of a major power outage.
This presumption of 100 hours per year of emergency operation is
consistent with EPA's approach to calculating the PTE of such
generators. EPA has recognized that emergency operations are
unpredictable, and that they will be variable in duration but will
probably not last more than one day (24 hours) per emergency event.
Notwithstanding this likelihood that emergency conditions would not
exceed 24 hours, EPA has suggested using a highly conservative
assumption of 500 hours per year of emergency operation. EPA
reasoned that even with this highly conservative number, most
facilities with only a single generator will remain below the agency's
"major source" regulatory applicability thresholds. But EPA also made
clear that different presumptions may be appropriate based on other
considerations.
The District has found that 100 hours per year is a more appropriate
presumption, for several reasons. For one, 500 hours - nearly 21
straight days - is an overestimate of the amount of time that any
facility would reasonably be expected to have to operate without grid
power, even in an extended emergency. For another, EPA's analysis
focused on small facilities with a single generator and whether a 500-
hour presumption was sufficiently low to keep such facilities from
exceeding the "major source" thresholds. 500 hours may be
sufficiently low for this purpose for facilities with only a single
generator, but it leads to unintended consequences for larger facilities
that may have multiple generators, or generators in conjunction with
Page 3 of 5
Page 4
Policy: Calculating Potential to Emit for Emergency
Backup Power Generators
other emitting sources. It is therefore more appropriate to use an
alternative presumption - as specifically contemplated by EPA- to
provide a more realistic estimate of reasonable worst-case emergency
operations. 100 hours per year is a more appropriate presumption for
this purpose.
This presumption is appropriate for calculating emergency backup
power generators' PTE when determining whether a facility is subject
to District permitting regulations. This is because the District generally
looks to a facility's highest potential emissions in any given year to
determine whether the facility should be subject to a particular
regulation, even if the emissions will not reach that level in every year
of operation. But the presumption is not appropriate for calculating the
amount of emissions that need to be offset under Regs. 2-2-302 and
2-2-303. Offsets are required to counterbalance emissions that occur
consistently and continuously every year, and thus hinder the region's
ability to attain and maintain applicable ambient air quality standards
on an ongoing basis. It is therefore appropriate to offset emissions
from testing and reliability-related operation, which will occur year in
and year out - but not emissions from emergency operation, which by
their very nature will not occur at all during most years of a generator's
life. Thus, in applying Reg. 2-2-606 and Reg. 2-2-607 to determine
the cumulative increase that a facility must offset, emissions from an
emergency backup power generator will be calculated based on its
testing and reliability-related operation only, and not any emergency
operation.
Prohibition of In implementing this policy, the Air District will not allow an
limit on owner/operator to accept a permit condition to limit emergency
emergency operation to less than 100 hours per year to reduce a source's PTE.
operation The District does not impose limits on emergency operations because
of the need to maintain flexibility to respond to emergency situations;
and because such limits would not be practically enforceable in any
event because if an emergency arises, most facilities would continue
to operate to mitigate the emergency notwithstanding of the threat of
District enforcement action for exceeding a permit limit. An
owner/operator may reduce a generator's PTE by accepting lower
limits on testing and reliability-related operation or by installing an
emissions control device, but not through accepting a limit on
emergency operation.
Page 4 of 5
Page 5
Policy:
Contact
Approval
Calculating Potential to Emit for Emergency
Backup Power Generators
Greg Stone, Extension 4 745
Name & Title Signature Date
Pamela Leong,
l/J~J~ h/3/-;J-{)/<1Director of
Engineering
Page 5 of 5
Policy: Calculating Potential to Emit for Emergency Backup Power Generators: summary, contents and background
This guide helps you understand the scope of Policy: Calculating Potential to Emit for Emergency Backup Power Generators before or alongside reading the original document. It is based on the catalogue record, credited creator, source, classification and topics shown on this page. It does not replace the original work and does not invent claims about passages that Doxxly cannot verify.
Summary and overview
Policy: Calculating Potential to Emit for Emergency Backup Power Generators is a 5-page documentcredited to Wren N. Dunmore. This policy requires the District to include 100 hours per year of emergency operation, in addition to permitted testing and reliability-related operation, when calculating emergency backup generators' potential to emit (PTE) for permitting applicability. It addresses New Source Review, small-facility offset eligibility, and Title V or Synthetic Minor Operating Permit requirements. Emergency-operation emissions are excluded when calculating the amount of emissions that must be offset. The policy does not apply to emergency fire pump engines or emergency-use emissions exempt under Toxics New Source Review. Operators cannot reduce PTE by accepting an emergency-operation limit below 100 hours per year. The policy takes effect upon the director's signature, is not retroactive, and applies to existing permitted generators at their next permit application. It appears in the Law & Legal Studies collection, which groups it with other material that readers may use for comparison and further study.
The item can be approached in several ways. A reader looking for a quick orientation can begin with the free five-page preview, inspect the page structure and use the metadata to judge relevance. Someone undertaking deeper research can work through the complete file, search its indexed text, record useful page references and compare its treatment of Emergency backup generators, Potential to emit, Air permitting, New Source Review, Title V, Emissions offsets, Regulatory policy with the related resources linked below.
Rather than reducing the work to a single claim, this page treats it as a source that should be read in context. The title, creator, publication source, licence and format all help explain what kind of evidence it may offer. Readers should distinguish the original author's statements from Doxxly's catalogue description, and should cite the original edition when using the material in academic, professional or published work.
Key topics and reader takeaways
The catalogue connects this document with Emergency backup generators, Potential to emit, Air permitting, New Source Review, Title V, Emissions offsets, Regulatory policy. These terms offer practical entry points rather than a substitute for close reading. Start by identifying the definitions, examples, arguments, tables or visual explanations attached to each topic. Then note where the creator draws connections, makes distinctions or moves from background material to a conclusion, recommendation, calculation or narrative development.
A useful reading method is to separate description from interpretation. First record what the item actually presents: names, headings, figures, formulas, quotations or stated propositions. Next consider why those details matter within the whole work. Finally compare them with another source from the same subject area. This process helps turn a long digital file into evidence that can be evaluated rather than merely skimmed.
Table of contents and reading guide
The following is an editorial content guide based on the verified catalogue topics. It is not represented as the original author's formal table of contents. Use it to organise notes while moving through the 5 pages in the player.
Part 1
Emergency backup generators
Use this section of the reading guide to identify how Emergency backup generators appears in Policy: Calculating Potential to Emit for Emergency Backup Power Generators, note important terms, and connect the subject to the wider purpose of the work.
Part 2
Potential to emit
Use this section of the reading guide to identify how Potential to emit appears in Policy: Calculating Potential to Emit for Emergency Backup Power Generators, note important terms, and connect the subject to the wider purpose of the work.
Part 3
Air permitting
Use this section of the reading guide to identify how Air permitting appears in Policy: Calculating Potential to Emit for Emergency Backup Power Generators, note important terms, and connect the subject to the wider purpose of the work.
Part 4
New Source Review
Use this section of the reading guide to identify how New Source Review appears in Policy: Calculating Potential to Emit for Emergency Backup Power Generators, note important terms, and connect the subject to the wider purpose of the work.
Part 5
Title V
Use this section of the reading guide to identify how Title V appears in Policy: Calculating Potential to Emit for Emergency Backup Power Generators, note important terms, and connect the subject to the wider purpose of the work.
Part 6
Emissions offsets
Use this section of the reading guide to identify how Emissions offsets appears in Policy: Calculating Potential to Emit for Emergency Backup Power Generators, note important terms, and connect the subject to the wider purpose of the work.
Part 7
Regulatory policy
Use this section of the reading guide to identify how Regulatory policy appears in Policy: Calculating Potential to Emit for Emergency Backup Power Generators, note important terms, and connect the subject to the wider purpose of the work.
When a heading in the original differs from this guide, follow the original heading in your citation. Page numbers can also vary between editions. Doxxly's direct page field is useful for navigation, but formal references should include the title, creator, source and edition details available in the file itself.
About Wren N. Dunmore
Doxxly credits Wren N. Dunmore as the author or creator of Policy: Calculating Potential to Emit for Emergency Backup Power Generators. This page does not add an unverified biography, job title or institutional affiliation. The attribution is preserved so readers can distinguish the creator from the hosting library and follow the original record when an external author link is available.
Author context matters because a work reflects a particular purpose, audience and point of view. Before relying on the material, consider what the creator set out to explain, when the source was produced and whether later research or revised guidance should also be consulted. For literature and philosophy, compare translations and editions; for technical material, check whether a newer version has superseded the one shown here.
About the source organisation
The recorded source for this item is baaqmd.gov. Doxxly provides access and discovery tools but does not claim to be the original publisher unless explicitly stated. Source links, creator attribution and the recorded Publicly available file collected for editorial review licence are displayed to help readers assess provenance and permitted use.
Provenance is especially important for reports, standards, presentations and working spreadsheets. Check the original source for amendments, supporting files and current policy. A trustworthy research workflow keeps the source URL with any notes or downloaded copy, verifies important figures against the original, and avoids treating an archived document as automatically current.
Begin with the title and opening pages, then use the guide above to decide whether to read sequentially or move to a particular topic. The Doxxly player provides previous and next navigation, a direct page field, zoom steps, fit-to-width and fit-to-page modes, rotation and fullscreen. These controls are useful when a page contains small type, a wide table, an image, a scanned layout or a dense sequence of notes.
The first five pages are open to every visitor. A plan unlocks the complete item and full-document search. Search is best used for distinctive names, technical terms or short phrases; broad words can produce too many possible contexts. When you find a useful passage, read the surrounding pages so that a sentence, chart or formula is not separated from its explanation.
If downloading is enabled, members can obtain the original PDF file. Keep the original format when formulas, slide sequencing, pagination or layout carries meaning. Respect the Publicly available file collected for editorial review terms displayed on this page, and use the rights-report link if you believe the attribution or availability needs review.
Research questions to consider
As you read Policy: Calculating Potential to Emit for Emergency Backup Power Generators, ask which audience the creator addresses, what problem or idea organises the work, what evidence is presented, and which assumptions remain unstated. Note whether important terms are defined consistently and whether examples represent a broader pattern or a narrow case. For quantitative material, record units, time periods, formulas and data sources. For interpretive material, separate the creator's language from your own summary.
A second set of questions concerns relevance today. Which parts remain durable, which depend on their historical or institutional setting, and what would need confirmation from a newer source? Following the tags and the Law & Legal Studies collection can reveal useful comparisons. Agreement between sources can strengthen confidence, while disagreement can point to changing definitions, methods, evidence or priorities.
Finally, decide what you need from the item: background knowledge, a quotation, a worked example, a model, a visual explanation or a starting bibliography. That purpose should guide the depth of reading and the notes you keep. Doxxly helps locate and navigate the source; careful interpretation remains the reader's responsibility.