Page 1
RELIABILITY | RESILIENCE | SECURITY NERC | Report Title | Report Date I Characteristics and Risks of Emerging Large Loads Large Loads Task Force White Paper July 2025
This July 2025 white paper characterizes emerging large electricity loads, including traditional and AI data centers, cryptocurrency mining, industrial facilities, and hydrogen production facilities, and assesses their risks to the North American bulk power system. It reviews existing large-load interconnection programs and explains why peak demand alone is insufficient to define a large load. Key topics include observability, demand forecasting, resource and transmission adequacy, balancing reserves, ride-through behavior, system stability, power quality, cybersecurity, load shedding, and restoration. The paper prioritizes risks and recommends further work on standards gaps, mitigation guidance, load classification, dynamic models, protection systems, and resource adequacy assessment.
The first 5 pages, shown as text so search engines and readers can find this document.
RELIABILITY | RESILIENCE | SECURITY NERC | Report Title | Report Date I Characteristics and Risks of Emerging Large Loads Large Loads Task Force White Paper July 2025
NERC | Characterization and Risks of Emerging Large Loads | July 2025 ii Table of Contents Preface ........................................................................................................................................................................... iv Executive Summary ......................................................................................................................................................... v A New Challenge on the Horizon................................................................................................................................. v NERC’S Response ......................................................................................................................................................... v Next Steps.................................................................................................................................................................. vii Chapter 1: Introduction to Large Loads .......................................................................................................................... 1 Intended Audience ...................................................................................................................................................... 1 NERC Large Loads Task Force ...................................................................................................................................... 1 Large Load Definition .................................................................................................................................................. 1 Background .................................................................................................................................................................. 2 Chapter 2: Characterization of Large Loads .................................................................................................................... 3 Categories of Large Loads............................................................................................................................................ 3 Data Centers and Other Computational Load ......................................................................................................... 3 Industrial Load ......................................................................................................................................................... 7 Hydrogen Production Facilities ................................................................................................................................ 8 Example Existing Large Load Programs and Constructs .............................................................................................. 9 Reliability Coordinators ........................................................................................................................................... 9 Utility-Specific Programs........................................................................................................................................ 11 Future Large Load Definition Considerations ............................................................................................................ 11 Single Number vs. Size Range ................................................................................................................................ 11 Behind-the-Meter Loads ........................................................................................................................................ 12 Real-Time Load Behavior ....................................................................................................................................... 13 Firm Load vs. Flexible Load .................................................................................................................................... 14 Chapter 3: Risks to the Bulk Power System .................................................................................................................. 15 Large Load Observability and Data Risks ................................................................................................................... 15 Long-Term Planning................................................................................................................................................... 15 Demand Forecasting .............................................................................................................................................. 15 Resource Adequacy ............................................................................................................................................... 16 Transmission Adequacy ......................................................................................................................................... 17 Operations/Balancing ................................................................................................................................................ 18 Short-Term Demand Forecasting........................................................................................................................... 18 Balancing and Reserves ......................................................................................................................................... 19 Lack of Real-Time Coordination ............................................................................................................................. 20
Table of Contents NERC | Characterization and Risks of Emerging Large Loads | July 2025 iii Outage Coordination in Operations Planning........................................................................................................ 21 Stability ...................................................................................................................................................................... 21 Ride-Through ......................................................................................................................................................... 22 Frequency Stability ................................................................................................................................................ 23 Rotor Angle Stability .............................................................................................................................................. 25 Voltage Stability ..................................................................................................................................................... 27 Resonance- and Converter-Driven Stability........................................................................................................... 28 Forced Oscillations ................................................................................................................................................. 29 Power Quality ............................................................................................................................................................ 32 Harmonics .............................................................................................................................................................. 32 Voltage Fluctuations .............................................................................................................................................. 34 Physical and Cyber Security Risks .............................................................................................................................. 36 Cyber Security ........................................................................................................................................................ 36 Load-Shedding Programs and System Restoration ................................................................................................... 36 Manual Load-Shed Obligation Impacts.................................................................................................................. 36 Automatic Under-Frequency Load-Shedding Programs ........................................................................................ 36 System Restoration ................................................................................................................................................ 36 Chapter 4: Conclusion ................................................................................................................................................... 38 Appendix A: Large Load Construct Data ....................................................................................................................... 40 Appendix B: Comparison of Characteristics and Risks .................................................................................................. 41 Appendix C: Acknowledgements .................................................................................................................................. 42
NERC | Characterization and Risks of Emerging Large Loads | July 2025 iv Preface Electricity is a key component of the fabric of modern society and the Electric Reliability Organization (ERO) Enterprise serves to strengthen that fabric. The vision for the ERO Enterprise, which is comprised of NERC and the six Regional Entities, is a highly reliable, resilient, and secure North American bulk power system (BPS). Our mission is to assure the effective and efficient reduction of risks to the reliability and security of the grid. Reliability | Resilience | Security Because nearly 400 million citizens in North America are counting on us The North American BPS is made up of six Regional Entities as shown on the map and in the corresponding table below. The multicolored area denotes overlap as some load-serving entities participate in one Regional Entity while associated Transmission Owners/Operators participate in another. MRO Midwest Reliability Organization NPCC Northeast Power Coordinating Council RF ReliabilityFirst SERC SERC Reliability Corporation Texas RE Texas Reliability Entity WECC WECC
NERC | Characterization and Risks of Emerging Large Loads | July 2025 v Executive Summary A New Challenge on the Horizon As the North American power system evolves, loads such as computational, industrial, and hydrogen production facilities are seeking to connect to the bulk power system (BPS) faster than ever before and at a magnitude beyond the largest currently operating loads. There is already evidence that large loads impact BPS reliability. For example, the Eastern and Electric Reliability Council of Texas (ERCOT) Interconnections have observed load-reduction events1 with each Interconnection experiencing approximately 1,500 MW of voltage-sensitive load reduction. The event in the Eastern Interconnection was primarily attributed to data centers and other power electronic loads (PEL) transferring load to backup generation and caused frequency overshoot and high voltages. The ERCOT Interconnection event involved many different types of loads of varying size reducing consumption during an extended low-voltage period in West Texas due to a protection system misoperation. These load-reduction events highlight some of the potential risks posed by large loads utilizing the BPS and why NERC is closely examining this issue. NERC’S Response NERC’s Reliability and Security Technical Committee (RSTC) established the Large Load Task Force (LLTF) to analyze the reliability impacts related to emerging large loads (e.g., data centers (including cryptocurrency mining, and artificial intelligence (AI)), industrial facilities, and hydrogen production facilities). This white paper characterizes large loads and defines the reliability risks that they may pose to the BPS. A reliability gap analysis white paper will follow, shedding more light on where the most significant risks exist. The loads examined in this paper range in size from several megawatts to several gigawatts, posing novel challenges to the reliability and security of the BPS. Several Reliability Coordinators (RC) and utilities have existing large-load constructs based primarily on facility peak demand. However, additional characteristics should be considered in any definition of large loads, as this white paper shows that peak demand is only one of many characteristics that can impact BPS reliability. 1 “Incident Review - Considering Simultaneous Voltage-Sensitive Load Reductions,” NERC, Jan. 2025. Available: https://www.nerc.com/pa/rrm/ea/Documents/Incident_Review_Large_Load_Loss.pdf There is already evidence that large loads impact bulk power system reliability. To better understand the reliability impacts, NERC established the Large Loads Task Force.
Doxxly editorial guide
This guide helps you understand the scope of Characteristics and Risks of Emerging Large Loads before or alongside reading the original document. It is based on the catalogue record, credited creator, source, classification and topics shown on this page. It does not replace the original work and does not invent claims about passages that Doxxly cannot verify.
Characteristics and Risks of Emerging Large Loads is a 49-page documentcredited to Mira X. Merrick. This July 2025 white paper characterizes emerging large electricity loads, including traditional and AI data centers, cryptocurrency mining, industrial facilities, and hydrogen production facilities, and assesses their risks to the North American bulk power system. It reviews existing large-load interconnection programs and explains why peak demand alone is insufficient to define a large load. Key topics include observability, demand forecasting, resource and transmission adequacy, balancing reserves, ride-through behavior, system stability, power quality, cybersecurity, load shedding, and restoration. The paper prioritizes risks and recommends further work on standards gaps, mitigation guidance, load classification, dynamic models, protection systems, and resource adequacy assessment. It appears in the Science & Engineering collection, which groups it with other material that readers may use for comparison and further study.
The item can be approached in several ways. A reader looking for a quick orientation can begin with the free five-page preview, inspect the page structure and use the metadata to judge relevance. Someone undertaking deeper research can work through the complete file, search its indexed text, record useful page references and compare its treatment of White paper, Large electricity loads, Bulk power system, Grid reliability, Data centers, Artificial intelligence, Cryptocurrency mining, Industrial loads, Hydrogen electrolysis, Power system stability, Grid planning, Cybersecurity with the related resources linked below.
Rather than reducing the work to a single claim, this page treats it as a source that should be read in context. The title, creator, publication source, licence and format all help explain what kind of evidence it may offer. Readers should distinguish the original author's statements from Doxxly's catalogue description, and should cite the original edition when using the material in academic, professional or published work.
The catalogue connects this document with White paper, Large electricity loads, Bulk power system, Grid reliability, Data centers, Artificial intelligence, Cryptocurrency mining, Industrial loads, Hydrogen electrolysis, Power system stability, Grid planning, Cybersecurity. These terms offer practical entry points rather than a substitute for close reading. Start by identifying the definitions, examples, arguments, tables or visual explanations attached to each topic. Then note where the creator draws connections, makes distinctions or moves from background material to a conclusion, recommendation, calculation or narrative development.
A useful reading method is to separate description from interpretation. First record what the item actually presents: names, headings, figures, formulas, quotations or stated propositions. Next consider why those details matter within the whole work. Finally compare them with another source from the same subject area. This process helps turn a long digital file into evidence that can be evaluated rather than merely skimmed.
The following is an editorial content guide based on the verified catalogue topics. It is not represented as the original author's formal table of contents. Use it to organise notes while moving through the 49 pages in the player.
Use this section of the reading guide to identify how White paper appears in Characteristics and Risks of Emerging Large Loads, note important terms, and connect the subject to the wider purpose of the work.
Use this section of the reading guide to identify how Large electricity loads appears in Characteristics and Risks of Emerging Large Loads, note important terms, and connect the subject to the wider purpose of the work.
Use this section of the reading guide to identify how Bulk power system appears in Characteristics and Risks of Emerging Large Loads, note important terms, and connect the subject to the wider purpose of the work.
Use this section of the reading guide to identify how Grid reliability appears in Characteristics and Risks of Emerging Large Loads, note important terms, and connect the subject to the wider purpose of the work.
Use this section of the reading guide to identify how Data centers appears in Characteristics and Risks of Emerging Large Loads, note important terms, and connect the subject to the wider purpose of the work.
Use this section of the reading guide to identify how Artificial intelligence appears in Characteristics and Risks of Emerging Large Loads, note important terms, and connect the subject to the wider purpose of the work.
Use this section of the reading guide to identify how Cryptocurrency mining appears in Characteristics and Risks of Emerging Large Loads, note important terms, and connect the subject to the wider purpose of the work.
Use this section of the reading guide to identify how Industrial loads appears in Characteristics and Risks of Emerging Large Loads, note important terms, and connect the subject to the wider purpose of the work.
When a heading in the original differs from this guide, follow the original heading in your citation. Page numbers can also vary between editions. Doxxly's direct page field is useful for navigation, but formal references should include the title, creator, source and edition details available in the file itself.
Doxxly credits Mira X. Merrick as the author or creator of Characteristics and Risks of Emerging Large Loads. This page does not add an unverified biography, job title or institutional affiliation. The attribution is preserved so readers can distinguish the creator from the hosting library and follow the original record when an external author link is available.
Author context matters because a work reflects a particular purpose, audience and point of view. Before relying on the material, consider what the creator set out to explain, when the source was produced and whether later research or revised guidance should also be consulted. For literature and philosophy, compare translations and editions; for technical material, check whether a newer version has superseded the one shown here.
The recorded source for this item is nerc.com. Doxxly provides access and discovery tools but does not claim to be the original publisher unless explicitly stated. Source links, creator attribution and the recorded Publicly available file collected for editorial review licence are displayed to help readers assess provenance and permitted use.
Provenance is especially important for reports, standards, presentations and working spreadsheets. Check the original source for amendments, supporting files and current policy. A trustworthy research workflow keeps the source URL with any notes or downloaded copy, verifies important figures against the original, and avoids treating an archived document as automatically current.
Visit nerc.comBegin with the title and opening pages, then use the guide above to decide whether to read sequentially or move to a particular topic. The Doxxly player provides previous and next navigation, a direct page field, zoom steps, fit-to-width and fit-to-page modes, rotation and fullscreen. These controls are useful when a page contains small type, a wide table, an image, a scanned layout or a dense sequence of notes.
The first five pages are open to every visitor. A plan unlocks the complete item and full-document search. Search is best used for distinctive names, technical terms or short phrases; broad words can produce too many possible contexts. When you find a useful passage, read the surrounding pages so that a sentence, chart or formula is not separated from its explanation.
If downloading is enabled, members can obtain the original PDF file. Keep the original format when formulas, slide sequencing, pagination or layout carries meaning. Respect the Publicly available file collected for editorial review terms displayed on this page, and use the rights-report link if you believe the attribution or availability needs review.
As you read Characteristics and Risks of Emerging Large Loads, ask which audience the creator addresses, what problem or idea organises the work, what evidence is presented, and which assumptions remain unstated. Note whether important terms are defined consistently and whether examples represent a broader pattern or a narrow case. For quantitative material, record units, time periods, formulas and data sources. For interpretive material, separate the creator's language from your own summary.
A second set of questions concerns relevance today. Which parts remain durable, which depend on their historical or institutional setting, and what would need confirmation from a newer source? Following the tags and the Science & Engineering collection can reveal useful comparisons. Agreement between sources can strengthen confidence, while disagreement can point to changing definitions, methods, evidence or priorities.
Finally, decide what you need from the item: background knowledge, a quotation, a worked example, a model, a visual explanation or a starting bibliography. That purpose should guide the depth of reading and the notes you keep. Doxxly helps locate and navigate the source; careful interpretation remains the reader's responsibility.
Practical answers about reading, downloading and understanding this document on Doxxly.

National Aeronautics and Space Administration

National Aeronautics and Space Administration

National Aeronautics and Space Administration

Charles Darwin
Cleo I. Cressley
Talia N. Kestrel